Sheet Metal RFQ Checklist: Flat Pattern, Bends, Hardware and Finish
Send the formed 3D model and controlled drawing, then define material/thickness, grain, bend radii, critical formed dimensions, hardware, welding, edge quality, finish, quantities and inspection.

A clean RFQ prevents the supplier from guessing the flat pattern, bend table and cosmetic standard. The useful outcome is a controlled specification that lets engineering, purchasing, manufacturing and quality make the same decision.
Decision table
| Control point | Define in the RFQ | Risk if omitted |
|---|---|---|
| Model | Formed STEP plus drawing; DXF only by agreement | Flat pattern uses the wrong bend rule |
| Material | Grade, temper/coating and actual thickness | Bend response and finish differ |
| Features | Bends, hems, inserts, welds and critical datums | Secondary operations are omitted |
| Appearance | A/B surfaces, grain direction and color sample | Cosmetic expectations appear after production |

Control the formed part
Unless the buyer owns the exact bend data, the formed geometry and critical dimensions should control. Let the fabricator produce the flat pattern from validated tooling data, then approve any deviation.
Buyer action: Add the related requirement, acceptance method and responsible party to the RFQ or drawing clarification log. Do not leave it as an unwritten assumption.
Mark critical bend relationships
Identify flange lengths, hole-to-bend relationships, angles and mounting datums tied to assembly. Avoid applying the same tight tolerance to every nonfunctional edge.
Buyer action: Add the related requirement, acceptance method and responsible party to the RFQ or drawing clarification log. Do not leave it as an unwritten assumption.
Specify installed hardware
List fastener manufacturer/part number or performance requirement, installation side, protrusion and torque/push-out criteria when applicable. Include weld symbols and finishing sequence.
Buyer action: Add the related requirement, acceptance method and responsible party to the RFQ or drawing clarification log. Do not leave it as an unwritten assumption.
Package the commercial requirements
State prototype and production quantities, tooling expectation, packing protection, destination and desired first-article evidence so the quote covers the complete route.
Buyer action: Add the related requirement, acceptance method and responsible party to the RFQ or drawing clarification log. Do not leave it as an unwritten assumption.
How to compare supplier responses
Do not score a supplier by how quickly it returns a price. Score the response by how many technical and commercial assumptions it closes. A strong quotation identifies the released inputs, exclusions, substitutions, one-time charges, recurring price and first-shipment evidence.
Use the same comparison sheet for every bidder: price basis, quantity, material, route, finish, inspection, documentation, packaging, delivery term, lead-time start and quotation validity. Resolve scope differences before negotiating price.
Model: ask for objective evidence
The quotation should state formed step plus drawing; dxf only by agreement. If it does not, ask how the supplier will prevent flat pattern uses the wrong bend rule, which document records acceptance, and what happens when the result is outside the requirement. A useful answer names the process owner, inspection or review method, frequency and record—not only a quality promise.
Material: ask for objective evidence
The quotation should state grade, temper/coating and actual thickness. If it does not, ask how the supplier will prevent bend response and finish differ, which document records acceptance, and what happens when the result is outside the requirement. A useful answer names the process owner, inspection or review method, frequency and record—not only a quality promise.
Features: ask for objective evidence
The quotation should state bends, hems, inserts, welds and critical datums. If it does not, ask how the supplier will prevent secondary operations are omitted, which document records acceptance, and what happens when the result is outside the requirement. A useful answer names the process owner, inspection or review method, frequency and record—not only a quality promise.
Appearance: ask for objective evidence
The quotation should state a/b surfaces, grain direction and color sample. If it does not, ask how the supplier will prevent cosmetic expectations appear after production, which document records acceptance, and what happens when the result is outside the requirement. A useful answer names the process owner, inspection or review method, frequency and record—not only a quality promise.

RFQ checklist
- Controlled part number, drawing revision, units and 3D model
- Exact material grade/condition and certificate requirement
- Critical dimensions, threads, sealing faces and datums
- Surface treatment and post-finish acceptance
- Prototype/batch quantities, destination and delivery term
- Inspection, test, traceability and reporting
- Packaging and repeat-order expectations
Practical buyer scenario
A buyer receives two quotes for the same nominal part. One is cheaper but lists only material and unit price. The second states the drawing revision, manufacturing route, treatment, critical inspection, sample approval and delivery basis. Normalize scope, close technical questions and compare cost per accepted part—not a headline price built on missing assumptions.

Frequently asked questions
Should I send a DXF or STEP file?
Send the formed STEP model and drawing. Supply a DXF only when its revision and bend assumptions are controlled with the supplier.
Who should calculate the flat pattern?
The fabricator is usually best placed to use its actual tools and bend data, while the buyer controls final formed geometry.
How should cosmetic surfaces be marked?
Use a drawing map or annotated image that defines visible zones, grain direction and acceptable defects.
What increases sheet-metal quote time?
Missing thickness, unclear revision, undefined finish, ambiguous hardware and no quantity or destination.
Sources and standards references
- KEC Tour — custom metal parts and non-standard hardware
- ASME Y14.5 — Dimensioning and Tolerancing
- ISO 286-1 — ISO code system for tolerances on linear sizes
Engineering note: confirm the standard edition, customer specification and regulatory obligations for the actual part. KEC Tour provides manufacturing and DFM input; the buyer retains product-design and application-validation responsibility.
Related engineering guides
Have a custom metal part to manufacture?
Send the controlled drawing, sample or photo plus material, quantity, finish and inspection needs.
Turn your requirements into a production-ready RFQ.
Share your CAD file, material, critical dimensions, finish and target volume. KEC Tour will review the process route before quoting.