Sheet Metal RFQ Checklist: Flat Pattern, Bends, Hardware and Finish

Prepare a sheet metal RFQ with the formed drawing, flat pattern, material, bend details, hardware, finish and assembly requirements.

Sheet Metal RFQ Checklist: Flat Pattern, Bends, Hardware and Finish

What to specify for this part

Control pointDefine in the RFQRisk if omitted
ModelFormed STEP plus drawing; DXF only by agreementFlat pattern uses the wrong bend rule
MaterialGrade, temper/coating and actual thicknessBend response and finish differ
FeaturesBends, hems, inserts, welds and critical datumsSecondary operations are omitted
AppearanceA/B surfaces, grain direction and color sampleCosmetic expectations appear after production

Control the formed part

Unless the buyer owns the exact bend data, the formed geometry and critical dimensions should control. Let the fabricator produce the flat pattern from validated tooling data, then approve any deviation. A formed bracket can be correct even when its developed blank differs from an early customer DXF. Identify whether the formed dimensions or the supplied flat is controlling before quotation. If both must be maintained, investigate the conflict through a bend trial rather than changing either silently.

Mark critical bend relationships

Identify flange lengths, hole-to-bend relationships, angles and mounting datums tied to assembly. Avoid applying the same tight tolerance to every nonfunctional edge. For a mounting hole near a bend, review the actual punch, die and forming method. Distortion can affect the hole even if its flat-pattern position is correct. Consider moving the hole or finishing it after bending where the assembly permits and the extra operation is justified.

Rows of enclosed machining equipment.
Rows of enclosed machining equipment.

Specify installed hardware

List fastener manufacturer/part number or performance requirement, installation side, protrusion and torque/push-out criteria when applicable. Include weld symbols and finishing sequence. Self-clinching hardware needs a suitable sheet hardness, thickness, hole size and installation force. Use the selected fastener manufacturer's requirements rather than treating all inserts as equivalent. Check the installed side and clearance to adjacent bends before committing the flat layout.

Package the commercial requirements

State prototype and production quantities, tooling expectation, packing protection, destination and desired first-article evidence so the quote covers the complete route. Include hardware installation, deburring, weld cleanup and finish inspection in the quote. A low flat-blank price does not represent an assembled enclosure. Request a production-intent sample with the installed fasteners so the buyer can check access and fit.

Frequently asked questions

Should I send a DXF or STEP file?

Send the formed STEP model and drawing. Supply a DXF only when its revision and bend assumptions are controlled with the supplier.

Who should calculate the flat pattern?

The fabricator is usually best placed to use its actual tools and bend data, while the buyer controls final formed geometry.

How should cosmetic surfaces be marked?

Use a drawing map or annotated image that defines visible zones, grain direction and acceptable defects.

What increases sheet-metal quote time?

Missing thickness, unclear revision, undefined finish, ambiguous hardware and no quantity or destination.

Sources and further reading

Send KEC Tour the relevant drawing and interface requirements for review of the proposed manufacturing route.

Zaid Arshad, Manufacturing Content Author
ABOUT THE AUTHOR

Zaid Arshad

Manufacturing Content Author · KEC Tour

Zaid Arshad writes practical manufacturing guides for engineers and sourcing teams evaluating custom fittings, CNC-turned parts, sheet-metal components, stampings and die-cast parts. His articles focus on clearer RFQs, supplier evidence, inspection planning and drawing-to-production decisions.

Custom metal partsCNC turningRFQ preparationInspection planningSupplier sourcing
View author profile
FOLLOW THE COMPANYKEC Tour
DRAWING REVIEW

Turn your requirements into a production-ready RFQ.

Share your CAD file, material, critical dimensions, finish and target volume. KEC Tour will review the process route before quoting.

Start your RFQ
Start with the drawing

Need a quote for a non-standard metal part?

Send drawing or sample details